DELIVERY & INSTALLATION PROCESS
FitzMac Modular Units are then transported via an escorted truck low loader convoy to the site for installation.
These Modular Units are then lifted into place via either Hiab or Mobile Crane and are bolted together to create the desired superstructure.
Once all modules are in place, immediate works take place to ensure building weathertightness and all external flashings are fixture are then installed.